The IBM 80P6461 is a third 2-way 1.9GHz POWER5 processor card in the CCIN 272F family, alongside the IBM 80P6844 and 80P6838 processor cards elsewhere in our range, built for the IBM eServer p5/pSeries 9117-570 server. The 570’s modular design takes two processor card positions per drawer, with CCIN 272F cards combined across drawers to build system configurations from 2-way up to 16-way.
As one of IBM’s most widely deployed p5 platforms, the 570 remains in active service across many enterprise Unix/AIX estates, and a matched-CCIN spare card is the standard way to restore a failed processor position. Confirm your system’s existing CCIN and drawer configuration before ordering, since mixing processor clock speeds within one system is not supported.
Tech-Star (UK-based, shipped worldwide) stocks IBM pSeries processor hardware. Please contact our sales team for current stock and pricing.
Worldwide supply. We export new and refurbished telecoms and networking equipment internationally. International buyers welcome, request a delivered quote in your currency. Supply subject to export checks.
Frequently asked questions
Is the IBM 80P6461 refurbished or new?
Tech-Star supplies both new and refurbished IBM 80P6461. Refurbished items are tested and graded against manufacturer specifications; the condition is confirmed at quote.
What warranty is included with the IBM 80P6461?
Refurbished IBM 80P6461 comes with a 90-day parts and labour warranty as standard. Extended warranty options are available on request.
How do I get a price for the IBM 80P6461?
Pricing reflects current stock and lead time, so we quote per enquiry. Submit the part number through the contact form for a quote, typically within one business hour.
Can the IBM 80P6461 be returned?
Returns are accepted within 14 days of delivery in line with our return policy. A restocking fee may apply for opened items.
How quickly can the IBM 80P6461 be delivered?
Lead time depends on current stock. UK-based items typically ship the next business day; sourced items vary. We confirm lead time at quote.