The IBM 00E0819 is an I/O backplane, CCIN 2B59, for the Power 770 (9117-MMD) server. The backplane distributes PCIe and internal I/O connectivity within the 9117-MMD’s CEC drawer, linking the processor books to the system’s adapter slots and internal storage, and is a routine replacement when a Power 770 experiences a backplane fault or is being reconditioned for redeployment. Because this CCIN spans several IBM part numbers issued at different points in the product’s service life, buyers should match by CCIN and system model as well as part number when sourcing a replacement. Power 770 systems of this generation remain in active service in many enterprise data centres well beyond their original warranty period, keeping demand for genuine backplane FRUs steady. Tech-Star is UK-based and ships worldwide, and can confirm CCIN compatibility against your specific 9117-MMD configuration.
Worldwide supply. We export new and refurbished telecoms and networking equipment internationally. International buyers welcome, request a delivered quote in your currency. Supply subject to export checks.
Frequently asked questions
Is the IBM 00E0819 refurbished or new?
Tech-Star supplies both new and refurbished IBM 00E0819. Refurbished items are tested and graded against manufacturer specifications; the condition is confirmed at quote.
What warranty is included with the IBM 00E0819?
Refurbished IBM 00E0819 comes with a 90-day parts and labour warranty as standard. Extended warranty options are available on request.
How do I get a price for the IBM 00E0819?
Pricing reflects current stock and lead time, so we quote per enquiry. Submit the part number through the contact form for a quote, typically within one business hour.
Can the IBM 00E0819 be returned?
Returns are accepted within 14 days of delivery in line with our return policy. A restocking fee may apply for opened items.
How quickly can the IBM 00E0819 be delivered?
Lead time depends on current stock. UK-based items typically ship the next business day; sourced items vary. We confirm lead time at quote.