The IBM 74Y3723 is a 6-core 3.7GHz POWER7 processor card, CCIN 542C, with 8x DDR3 DIMM slots, fitted to IBM’s Power 750 (8233-E8B) server. It carries the POWER7 chip and the DIMM sockets for that processor’s local memory, plugging into a Power 750 chassis to provide compute capacity. Power 750 hardware of this generation remains in active enterprise service, and a genuine spare processor card such as this one is a routine requirement for restoring full core count after a card failure or upgrading an existing chassis. Specifiers should confirm the exact machine type and existing core/clock mix before ordering, since Power7 processor cards within the same chassis family are not universally interchangeable. Tech-Star (UK-based, shipped worldwide) stocks IBM Power Systems components to support ongoing server maintenance projects. Please contact our sales team for current availability and pricing.
Worldwide supply. We export new and refurbished telecoms and networking equipment internationally. International buyers welcome, request a delivered quote in your currency. Supply subject to export checks.
Frequently asked questions
Is the IBM 74Y3723 refurbished or new?
Tech-Star supplies both new and refurbished IBM 74Y3723. Refurbished items are tested and graded against manufacturer specifications; the condition is confirmed at quote.
What warranty is included with the IBM 74Y3723?
Refurbished IBM 74Y3723 comes with a 90-day parts and labour warranty as standard. Extended warranty options are available on request.
How do I get a price for the IBM 74Y3723?
Pricing reflects current stock and lead time, so we quote per enquiry. Submit the part number through the contact form for a quote, typically within one business hour.
Can the IBM 74Y3723 be returned?
Returns are accepted within 14 days of delivery in line with our return policy. A restocking fee may apply for opened items.
How quickly can the IBM 74Y3723 be delivered?
Lead time depends on current stock. UK-based items typically ship the next business day; sourced items vary. We confirm lead time at quote.