The IBM 53P4832 is a 435W AC hot-swap redundant power supply, CCIN 515F, designed for the 5095/0595 PCI-X expansion tower and the 7311-D20/6268 family of pSeries I/O drawers. Fitted in pairs for N+1 redundancy, the supply allows a live drive or hot-swap to continue operating and be replaced without powering down the drawer, protecting the adapters and disks installed inside it from an unplanned outage. pSeries and AS/400/iSeries expansion towers using this power-supply family remain in service across many established midrange and enterprise environments, and a genuine, correctly rated 435W unit is required to restore full redundancy after a supply failure, since running on a single supply removes the fault tolerance the drawer was designed to provide. Tech-Star (UK-based, shipped worldwide) supplies the 53P4832 for engineers maintaining pSeries and iSeries expansion tower power redundancy.
Worldwide supply. We export new and refurbished telecoms and networking equipment internationally. International buyers welcome, request a delivered quote in your currency. Supply subject to export checks.
Frequently asked questions
Is the IBM 53P4832 refurbished or new?
Tech-Star supplies both new and refurbished IBM 53P4832. Refurbished items are tested and graded against manufacturer specifications; the condition is confirmed at quote.
What warranty is included with the IBM 53P4832?
Refurbished IBM 53P4832 comes with a 90-day parts and labour warranty as standard. Extended warranty options are available on request.
How do I get a price for the IBM 53P4832?
Pricing reflects current stock and lead time, so we quote per enquiry. Submit the part number through the contact form for a quote, typically within one business hour.
Can the IBM 53P4832 be returned?
Returns are accepted within 14 days of delivery in line with our return policy. A restocking fee may apply for opened items.
How quickly can the IBM 53P4832 be delivered?
Lead time depends on current stock. UK-based items typically ship the next business day; sourced items vary. We confirm lead time at quote.